Skip to content

Sector

Subcontracting for energy and nuclear

Fabrication, pipework, machining of large parts, structures and maintenance: what energy players, from nuclear to renewables, are looking for, and how to prepare your request.

The energy sector brings together very different worlds: nuclear, thermal and hydro power generation, wind and solar, electricity grids, hydrogen, oil, gas and biogas. What they have in common is safety: this equipment contains pressurised fluids, heat or voltage, and a failure can have serious consequences for people and the environment.

Regulation therefore weighs more heavily here than elsewhere. Directive 2014/68/EU governs pressure equipment, Directive 2014/34/EU covers equipment intended for explosive atmospheres, and nuclear has its own design and manufacturing rules, such as the RCC-M code. Parts are often large and thick, in carbon steel, stainless steel or nickel alloy, with a large share of fabrication, non-destructive testing and pressure tests.

The market is not limited to major programmes: maintenance and planned outages, spare parts for legacy equipment, tooling, wind turbine and solar panel structures, hydrogen. These needs are open to fabrication, machining and maintenance workshops, provided the applicable standard is stated clearly.

Sector requirements

Standards, regulations and practices that buyers expect from their subcontractors.

01

Pressure equipment: Directive 2014/68/EU

Applicable above 0.5 bar maximum pressure, it classifies equipment into categories I to IV according to pressure, volume and fluid, and requires conformity assessment and CE marking. From category II, welders and welding procedures are approved by a competent third party.

02

Qualified welding and inspection

Welders (EN ISO 9606) and welding procedures (EN ISO 15614) are qualified, the workshop applies EN ISO 3834 for the quality of fusion welding, and non-destructive testing is carried out by certified personnel (EN ISO 9712). Acceptance criteria are given on the drawing.

03

Nuclear: RCC-M and safety rules

Mechanical components of pressurised water reactors are designed and manufactured to the RCC-M code, published by AFCEN; RCC-MRx covers other installations, such as research reactors. The operator oversees its external contractors: qualifications, audits, enhanced traceability.

04

Explosive atmospheres and harsh environments

Equipment intended for areas at risk of explosion falls under Directive 2014/34/EU (ATEX). Outdoor or marine structures are protected against corrosion to ISO 12944, and hydrogen requires materials suited to the risk of embrittlement.

05

Documentation, testing and inspection

Quality assurance plan, hold points, 3.1 or 3.2 material certificates, hydrostatic test, inspection records, end-of-manufacturing file: the proof is part of the product, and third-party inspection must be built into the schedule.

Typical parts and sub-assemblies

  • Tanks, vessels, receivers and drums subject to pressure or vacuum
  • Heat exchangers, headers, pipework and welded branches
  • Machined flanges, fittings, valve bodies, pump bodies and turbine parts
  • Structures and supports: frames, platforms, walkways, pipe supports
  • Wind turbine and solar structure components: flanges, base plates, tower sections
  • Cabinets, enclosures, busbars and covers for electrical substations
  • Hydrogen components: tanks, high-pressure fittings, cell plates
  • Spare parts and maintenance work during planned outages

Skills involved

Each skill has its own detailed page: services, materials, price factors.

All areas of expertise

Welding & boilermaking

The heart of the sector: welded tanks, pipework, heat exchangers and structures in carbon steel, stainless steel or nickel alloy, by qualified welders and procedures.

CNC machining

Machining of large parts: large-diameter turning, boring, milling of flanges and bodies, often from forged or cast blanks.

Sheet metalwork & cutting

Plasma, laser or waterjet cutting of thick plate, rolling, forming and bending for shells and structures, within the limits of the workshop’s machinery.

Inspection & metrology

Non-destructive testing (dye penetrant, magnetic particle, ultrasonic, radiographic), dimensional inspection of large assemblies, hydrostatic tests.

Surface treatment

Hot-dip galvanising, painting to ISO 12944 and stress-relief heat treatments for structures exposed to the weather or to marine corrosion.

Industrial maintenance

On-site and workshop maintenance: planned outages, component replacement, overhaul of pumps, valves and mechanical units, by authorised teams.

Materials

Steels for pressure equipment (P265GH, P355NH, EN 10028)Structural steels (S355, EN 10025) for structuresChromium-molybdenum alloy steels (13CrMo4-5, P91)Austenitic and duplex stainless steels (304L, 316L, 2205)Nickel alloys (Inconel 625, Incoloy 800)Copper and aluminium for electrical conductionTitanium for heat exchangers and marine environments

Tips for your quote request

Post a request
  • State the applicable regulation: Directive 2014/68/EU (category, pressure, fluid), ATEX, nuclear rules or a simple construction code (EN 13445, EN 13480, CODAP, ASME).
  • Provide the drawing with the welding specification, quality levels (EN ISO 5817), the inspections required (methods, extent, criteria) and the tests.
  • Specify the material with its standard and the certificate (3.1 or 3.2), and say who supplies it: heavy plate and forgings sometimes have long lead times.
  • Give dimensions and weights: the workshop must have suitable overhead cranes, furnaces or booths.
  • Indicate the hold points, the inspections by the customer or a third party and, for planned maintenance, the intervention window.

Pressure equipment: what Directive 2014/68/EU says

Directive 2014/68/EU, known as the PED, governs the design, manufacture and placing on the market of pressure equipment whose maximum allowable pressure exceeds 0.5 bar. It is sorted into categories I to IV, IV being the most demanding, according to pressure, volume or nominal size and fluid group. The higher the category, the more thorough the conformity assessment, with a notified body from category II. Low-risk equipment falls under sound engineering practice, without CE marking.

The manufacturer within the meaning of the directive is whoever places the equipment on the market under their own name: they answer for conformity. The subcontractor who welds a shell or machines a flange contributes to it, but the contract must specify who does what: design, material procurement, qualification of welders and welding procedures, inspections, testing, documentation.

Construction codes, such as EN 13445 for vessels, EN 13480 for piping or CODAP, provide the calculation and manufacturing rules. To size the blank, the weight calculator gives an order of magnitude; for welding, our guide to TIG, MIG and MAG processes covers the basics.

Nuclear: a framework of its own

In nuclear, manufacturing a component is not just a matter of industrial quality: it forms part of a safety demonstration. Mechanical components of pressurised water reactors follow the RCC-M rules, and nuclear pressure equipment has its own regulations. The operator of a basic nuclear installation must oversee the external contractors who carry out activities important for protection: it therefore imposes qualification, traceability and audit requirements on its suppliers, and in turn on their subcontractors.

A workshop aiming at safety-classified nuclear work must be qualified by the buyer, providing proof of its processes, its welders, its inspections and its control of its own subcontractors. This qualification takes time and investment: it is aimed at workshops already used to documentation requirements. Many activities, however, fall outside this scope: conventional maintenance, tooling, structures, non-safety-classified equipment. Specify the real level of requirements for your part and see the welding and fabrication page.

Frequently asked questions

A question not answered here? Visit the help centre or write to us.

Does a fabrication workshop need to be certified to make pressure equipment?

The directive does not require a company certificate from the subcontractor as such, but it does require welding procedures and welders to be approved by a competent third party from category II. Depending on the customer, the workshop also applies EN ISO 3834 or holds ISO 9001.

What is RCC-M?

It is a design and construction code for mechanical equipment in the nuclear islands of pressurised water reactors, published by AFCEN. It sets rules for materials, welding, inspection and documentation. To apply it, the workshop is qualified by its buyer, on the basis of its processes, its personnel and its organisation.

What is the difference between a 3.1 and a 3.2 material certificate?

These inspection certificates are defined by EN 10204. The 3.1 is issued by the material producer, through a representative independent of manufacturing, with the test results. The 3.2 is also validated by an inspector independent of the producer, for example one from the customer or a third-party body. State the type expected in your project request.

Do nuclear requirements apply to renewable energy?

No. Wind turbine, solar panel or grid structures fall under other standards: EN 1090 for the execution of steel structures, ISO 12944 for corrosion protection, the EN 61439 series for electrical cabinets. Requirements are generally more accessible, but remain real.

Guides to go further

All guides

A project to have manufactured?

Describe your needs and requirements (standards, certificates, expected documents) and compare quotes from workshops. It’s free.

Are you a workshop?

Create your profile for free and respond to requests that match your expertise.