Skip to content

Sector

Aerospace and space subcontracting

Machined parts, precision sheet metalwork, special processes, inspection: what aerospace and space buyers expect from their suppliers, and how to prepare your request for a quote.

Aerospace and space companies make parts in short runs, but every part must prove what it is: its material, its process, its history, its dimensions. The industry is organised in tiers. Airframers, engine makers and launcher prime contractors assemble; tier 1 equipment suppliers deliver sub-assemblies; tier 2 and 3 SMEs machine, form, weld, treat and inspect the individual parts.

Working in this sector therefore requires a recognised quality system, most often EN 9100, controlled processes and flawless documentation. For a buyer, this means difficult materials (titanium, high-strength aluminium, nickel), modest quantities and qualification lead times to allow for.

Drones, test rigs, start-ups and “new space” companies are sometimes more flexible, but the logic remains the same: define what is required, then prove it part after part, notably through the first article inspection, which validates the process before the production run.

Sector requirements

Standards, regulations and practices that buyers expect from their subcontractors.

01

EN 9100 quality system

Derived from ISO 9001, EN 9100 adds control of risk, configuration and product safety, as well as the prevention of counterfeit parts. Certificates are listed in the IAQG’s OASIS database. Variants exist for maintenance (EN 9110) and distribution (EN 9120).

02

Special processes and NADCAP

Heat treatment, anodising, non-destructive testing, welding: the result of a special process cannot be fully verified on the finished part. Many buyers require NADCAP accreditation, managed by the Performance Review Institute, or their own approval.

03

Full traceability

Every part is linked to a material batch, to a 3.1 certificate under EN 10204, to a manufacturing routing and to inspection records, kept for the period set by the contract, which is often very long.

04

First article inspection to EN 9102

Before the first delivery, and again after any change of drawing, process or site, the workshop carries out a documented, exhaustive inspection: ballooned drawing, three forms (part, materials and processes, measurement results) and measurement of every characteristic.

05

Configuration and nonconformance management

A part is made to the drawing revision in force. Any change of process, material or site must be approved by the customer, and a nonconforming part must not be reworked on the supplier’s own initiative: it calls for a concession or a decision from the customer.

Typical parts and sub-assemblies

  • Structural parts machined from solid: fittings, ribs, frames
  • Engine and turbomachinery parts: casings, flanges, spacers
  • Landing gear and actuator components: shafts, bushes, cylinder bodies
  • Fittings and manifolds for hydraulic, fuel and air systems
  • Formed precision sheet metalwork: fairings, cowlings, bulkheads, system brackets
  • Housings and brackets for avionics, drone and satellite equipment
  • Assembly tooling, jigs, inspection equipment and test rigs
  • Spare and maintenance parts, including for legacy programmes

Skills involved

Each skill has its own detailed page: services, materials, price factors.

All areas of expertise

CNC machining

5-axis machining of one-piece parts in aluminium, titanium or nickel, thin walls and large structures. Cutting conditions and fixtures are frozen at qualification.

Sheet metalwork & cutting

Laser or waterjet cutting, forming and bending of thin sheet in aluminium, titanium or stainless steel for cowlings, brackets and partitions.

Welding & boilermaking

Welding of pipework, tanks and structures by qualified welders to qualified procedures, with non-destructive testing of the welds.

Surface treatment

Anodising, passivation, chemical conversion, painting: special processes carried out to the customer’s specification, often by NADCAP-accredited workshops.

Inspection & metrology

Three-dimensional measurement, first article inspection, hardness, dye penetrant, magnetic particle inspection: calibrated equipment and qualified personnel, or a recognised laboratory.

3D printing

Metal or polymer additive manufacturing for prototypes, tooling and test rigs; a flight part requires a process and material qualified by the buyer.

Materials

High-strength aluminium alloys (2024, 7050, 7075, 6061)Titanium Ti-6Al-4V and commercially pure titaniumStainless steels (15-5PH, 17-4PH, 304L, 316L)Ultra-high-strength steels (300M, 15CDV6)Nickel alloys (Inconel 718, 625) for hot sectionsCarbon and glass composites, honeycombEngineering plastics (PEEK, PEI)

Tips for your quote request

Post a request
  • Specify the standard required: whether EN 9100 is mandatory, and which NADCAP accreditations or customer approvals apply to each special process.
  • Attach the drawing at the current revision, the 3D model and the material specification with its metallurgical condition. Cite the standard for each treatment rather than just the word “anodising”.
  • List the documents expected on delivery: 3.1 material certificate, process certificates, first article inspection report, certificate of conformity.
  • State quantity, rate and programme horizon: a prototype, a small batch and a multi-year contract are not organised in the same way.
  • Flag any restriction on the distribution of drawings, offer a non-disclosure agreement and ask for the workshop’s current valid certificates.

Understanding the aerospace subcontracting chain

An aircraft or a launcher is designed by a prime contractor who remains responsible for the final product. It entrusts manufacturing to tier 1 suppliers, who rely on SMEs for individual parts and processes. Requirements flow down the chain as contractual clauses: quality standard, process specifications, documents to deliver, audit rights. A tier 2 or 3 workshop therefore never handles just a drawing: it accepts a whole set of rules.

Before its first order, a supplier is qualified: audit of the quality system, verification of production and inspection equipment, pilot parts; special processes are approved separately. This takes time: a new workshop often wins its first contracts on simple parts, tooling or prototypes.

For you as a buyer, the consequence is practical: ask from the outset about the scope of the certificates, the subcontracted processes and any customer qualification. If you are developing a drone or ground equipment, adjust the level of requirements to the real risk and describe it in your specification. Our guide to supplier selection criteria offers a comparison grid.

What an aerospace manufacturing file contains

The delivered part comes with a file proving that it was made as planned. Its content is set by the order, but generally includes:

  • the type 3.1 material certificate, which links the part to a cast or a batch;
  • the manufacturing routing, signed off at each operation;
  • dimensional inspection reports, with the instruments used;
  • certificates for special processes (heat treatment, surface treatment, non-destructive testing);
  • the first article inspection report, at first delivery and after any change;
  • the signed certificate of conformity and, where applicable, concession decisions.

Traceability makes it possible to trace the part, the material batch and the operations if a problem arises. It has a cost that the workshop builds into its quote, but it also protects the buyer: better to request it in the project request than to discover it at delivery. See also our guide to dimensional inspection and first article inspection and the inspection and metrology page.

Frequently asked questions

A question not answered here? Visit the help centre or write to us.

Do you need EN 9100 certification to work with the aerospace industry?

EN 9100 is a contractual requirement rather than a legal obligation for the workshop. Most manufacturers and equipment suppliers require it from their series-part suppliers, then pass it down the chain. For prototypes, tooling or non-critical parts, some accept ISO 9001 or an audit. Ask your buyer.

What is NADCAP accreditation?

It is an accreditation programme for special processes in aerospace, space and defence, managed by the Performance Review Institute. It covers heat treatment, chemical processing, non-destructive testing and welding, among others. The audits rely on checklists drawn up by the prime contractors themselves.

What is a first article inspection (FAI)?

It is the exhaustive, documented inspection of the first production part, defined by EN 9102: every dimension and every requirement on the drawing is checked, and the materials and processes are justified. It is repeated after a change of drawing, process or site, or after a long production break.

Can a non-certified workshop make parts for a drone or a space project?

Yes, if your buyer or your risk analysis accepts it: drones, test rigs and start-up projects often adapt the level of requirements. Say what you expect (certified material, dimensional report, confidentiality) and ask the workshop to describe its inspection equipment.

Guides to go further

All guides
Buyers

5-axis machining: when do you really need it?

3+2 or continuous 5-axis machining: what each brings, the parts that justify 5 axes, the effect on price and the alternatives when you can do without.

8 min read CNC machining

A project to have manufactured?

Describe your needs and requirements (standards, certificates, expected documents) and compare quotes from workshops. It’s free.

Are you a workshop?

Create your profile for free and respond to requests that match your expertise.